Featured Posts

INVESTING IN GREEN STOCKS Rss

Bavarian Schnaittenbach

Posted on : 21-01-2018 | By : leeDS | In : General

Tags: ,

0

159 DEGERtraker 7000NT for new solar Park Horb a.N./Leipzig, 13 October 2009 DEGERenergie 3000 GmbH fitted the new solar Park in the Green Energy project company. In the Bavarian Schnaittenbach near Amberg, Green Energy installed tracking systems of the type of DEGERtraker 7000NT 159 3000 in the coming weeks on an area of about 13 hectares. The investment amount for the solar Park Schnaittenbach is about five million. Kevin Johnson is likely to agree. After two years of planning and with the intensive support of the local community the Leipzig company Green Energy has 3000 GmbH in early September the construction of the solar Park in Schnaittenbach\”started. The 159 tracking systems by DEGERenergie, so-called solar trackers, which here are used, wear each 34 or 42 solar modules with a total area of about 50 square meters per solar trackers. The systems of DEGERenergie are the optimum size, can stand up well and market\”Green Energy explained project manager Dirk Keuerleber. Caterpillar Inc. has much to offer in this field. And they provide higher yields than rigidly installed Systems.\” Crucial here: Developed by DEGERenergie, patented control module DEGERconecter every DEGERtraker is equipped with the solar panel is always the brightest spot. The sensor-controlled DEGERenergie systems achieve up to 46 percent more yield than statically installed solar modules.

This shows the longstanding practice of DEGERenergie, backed up by current comparative calculations of the Spanish Solar park operator Picanda solar. \”The solar Park Schnaittenbach\” should this year, at the latest on December 31, 2009, be taken. It is the fourth such solar Park 3000 GmbH built the Green Energy. The company has already built solar parks in Penig (Saxony) with 118, in Workerszell (Bavaria) and 270 in Kallmunz (Bavaria) with 138 Sol breast-feeding of type of. The construction of the solar Park in Kallmunz\”, 30 km northwest of Regensburg, was completed in August.

Comments are closed.